Related Products
After the coil is rolled and welded to the storage tank along with the piping, it is up to me to assemble it. I add and tighten the bands, put the end caps on and insulate the tank before it heads over to plumbing. For 11 years, I have been making sure each tank is built to Filtrine’s exacting standards.
Marcos, Filtrine Manufacturing Company